logo

Assembled monolithic structure box girder butterfly clamp concrete formwork construction for building commercial house

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


(PDF) The Art of Precast Concrete | Parisa zraati -

The Art of Precast Concrete. Parisa zraati. Download PDF. Download Full PDF Package. This paper. A short summary of this paper. 27 Full PDFs related to this paper ...

Building Construction Flashcards |

Box Girder. A built up beam in which more than one web plate is used ... used type of reinforced concrete construction, which consists of a solid slab supported by ...

Progressive Erection Applied to Box Girder with Strutted Wing

continuous box girder bridge with strutted wing slabs (photo 1;1)! It is erected progressively by assembling divided parts of the cross section! The erection of the central part of the box girder is followed by the construction of wing slabs! This paper presents the bridge technologies applied to progressive erection of the Uchimaki viaduct!

Free parametric BIM Models of "three" in GDL, 3DS, DWG and

Vertical cassette holder. Includes counterbalanced cabinet holder· vertical multi|sided capability with three field automatic exposure control and automatic collimation control. The unit is available in either right or left hand loading. Sturdy box girder construction· with nylon bearings and dual lock system.

ISO 6707-1:2004(en), Building and civil engineering

ISO 6707-1 was prepared by Technical Committee ISO/TC 59, Building construction, Subcommittee SC 2, Terminology and harmonization of languages, This third edition cancels and replaces the second edition ( ISO 6707-1|1989 ), which has been technically revised,

CN101838968A - Double track bridge construction process

The invention discloses a double track bridge construction process crossing existing railway operational lines` and the constructed double track bridge comprises a front side bridge section` a crossed existing line bridge section with mutually connected front and rear ends and a rear side bridge section·

Structural Concrete 01/2013 by Ernst & Sohn -

Structural Concrete, the official journal of the fib, provides conceptual and procedural guidance in the field of concrete construction, and features peer-reviewed papers, keynote research and |||

Structural Safety :: Confidential Reporting on Structural

An existing commercial building is to be converted to flats with an estimated contract value of £1:5m: The client has appointed a sole proprietor business: The main concern of the reporter is that the fees for a full investigation of existing structure, addition of an extra floor, and full design and drawing service was £4,300 i:e: about 0:3%:

BuildingWor

E51 ; Bridges by material of construction E511 ; Steel girder bridges E5111 ; Steel simple beam bridges E5112 ; Steel lattice girder bridges E5113 ; Steel truss bridges E5114 ; Steel box girder bridges E512 ; Concrete girder bridges E5121 ; Post-tensioned concrete girder bridges E5122 ; Pre-tensioned concrete girder bridges